Project Server 2013 Issue – TF294026: The following work item field does not exist

Explains how to resolve the TF294026 error in Project Server 2013 and TFS 2012 by adding missing work item fields required for integration with Scrum templates.

Published on
2 minute read
Image
https://nkdagility.com/resources/zTaVoXPnTVP
Subscribe

When you try to upload the default field mappings for Project Server 2013 integration with Team Foundation Server 2012 you can encounter a TF294026: The following work item field does not exist error.

Project Server 2013 Issue – TF294026: The following work item field does not exist

Figure: TF294026: The following work item field does not exist

With the message:

TF294026: The following work item field does not exist: Microsoft.VSTS.Scheduling.CompletedWork. Contact your administrator for Team Foundation Server to add this work item field.

You are unable to continue without fixing…

Applies to

Findings

Project Server requires that you have data for Remaining Work, Completed Work and Original Estimate for it to function correctly.

Project Server 2013 Issue – TF294026: The following work item field does not exist

Figure: The Task Work Item Type only includes Remaining Work

The Visual Studio Scrum Process Template however does not include these as they are not required for Scrum.

Solution

Use the instructions on Required Changes to Make When Mapping to a Team Project That Was Created From the Scrum Process Template to update the Task Work Item Type for the Visual Studio Scrum 2.0 template to add both the Completed Work and Original Estimate fields.

Warning The documentation on MSDN is currently out of date and misses two fields that need to be added. Make sure that you also add the Start and End dates.

1   The number of units of work that have been spent on this task
2
3
4   Initial value for Remaining Work - set once, when work begins.

Figure: Add both Original Estimate and Completed Work

Although we are adding these fields to the Task type we are not necessarily adding them to the UI for users to fill out. We can leave them available for Project Server, while out Team Members of a Scrum Team would be blissfully ignorant of their existence.

Troubleshooting
Subscribe

Related blog

No related videos found.

Connect with Martin Hinshelwood

If you've made it this far, it's worth connecting with our principal consultant and coach, Martin Hinshelwood, for a 30-minute 'ask me anything' call.

Our Happy Clients​

We partner with businesses across diverse industries, including finance, insurance, healthcare, pharmaceuticals, technology, engineering, transportation, hospitality, entertainment, legal, government, and military sectors.​

Boeing Logo

Boeing

Slaughter and May Logo

Slaughter and May

Illumina Logo

Illumina

Flowmaster (a Mentor Graphics Company) Logo

Flowmaster (a Mentor Graphics Company)

Epic Games Logo

Epic Games

NIT A/S

SuperControl Logo

SuperControl

Slicedbread Logo

Slicedbread

Graham & Brown Logo

Graham & Brown

Boxit Document Solutions Logo

Boxit Document Solutions

Schlumberger Logo

Schlumberger

Akaditi Logo

Akaditi

MacDonald Humfrey (Automation) Ltd. Logo

MacDonald Humfrey (Automation) Ltd.

Jack Links Logo

Jack Links

Freadom Logo

Freadom

Philips Logo

Philips

Trayport Logo

Trayport

Alignment Healthcare Logo

Alignment Healthcare

Nottingham County Council Logo

Nottingham County Council

Department of Work and Pensions (UK) Logo

Department of Work and Pensions (UK)

Ghana Police Service Logo

Ghana Police Service

Washington Department of Transport Logo

Washington Department of Transport

Royal Air Force Logo

Royal Air Force

New Hampshire Supreme Court Logo

New Hampshire Supreme Court

Milliman Logo

Milliman

Akaditi Logo

Akaditi

Ericson Logo

Ericson

Emerson Process Management Logo

Emerson Process Management

Kongsberg Maritime Logo

Kongsberg Maritime

Healthgrades Logo

Healthgrades